随着经济发展水平不断提高以及全国各地基础配套设施投资规模不断增长,施工领域中“三超”问题(指工程造价管理中的概算超估算、预算超概算、决算超预算现象)已成为行业内的突出难题。2013版建设工程施工合同(示范文本)已经开始实施,建筑信息模型(BIM)在建设工程项目中的应用越来越广泛,这些都为工程造价管理提供了新的条件和背景。作为工程造价控制的一个具体实施阶段,是将
With the continuous improvement of economic development and the increasing investment in basic infrastructure throughout the country, the problem of “three super” in the field of construction (referring to over estimation of budget estimates, budget over budget estimation and final budget over budget) has become Outstanding problems in the industry. 2013 version of the construction contract (model text) has started to be implemented, and the construction information model (BIM) has been widely used in construction projects. All of these have provided new conditions and background for project cost management. As a concrete implementation of project cost control phase is to be