通过对平一矿二水平的扩建工程,介绍了在力量安排、技术装备选择及施工组织等方面的实践体会,分析了加快建设速度的有关问题。
Through the two-level expansion project of Ping 1 Mine, this paper introduces the practical experience in the aspects of strength arrangement, selection of technical equipment and construction organization, and analyzes the related problems of speeding up the construction speed.