论文部分内容阅读
本文紧密结合黄河上游李家峡水电站工程,提出了用预锚结构加固受多组构造面切割的岩质高边坡的优化设计方法.
In this paper, the Lijiaxia hydropower project in the upper reaches of the Yellow River is closely linked with the optimization design method of prestressed anchored structures to reinforce rocky high slopes cut by multiple sets of structural planes.