苏州钢铁厂炼钢由1959年小转炉起步,经历了初期建设、巩固发展、长足进步几个阶段,截至1991年底,共炼出合格钢锭1571573吨,为省、市钢铁供应作出了一定的贡献。三十五个炼钢春秋,坎坷历程,至今回顾、总结、展望一下,对开拓未来,不无裨益: 1 初期建设时期(1958.9—1961.7) 为适应1958年“大跃进”形势需要、解决江苏省有铁无钢局面,由省、市批准,经过七个月边设计、边建设,1959年9月27日三座三吨涡鼓型空气侧吹转炉,投入生产。
Suzhou Iron and Steel Plant started from a small converter in 1959 and has undergone initial construction to consolidate its development and make great strides in progress. As of the end of 1991, a total of 1,571,573 tons of qualified steel ingots were made, contributing to the supply of steel to provinces and municipalities. Thirty-five steel spring and autumn, ups and downs, so far reviewed, summarized, look forward, to open up the future, without any benefit: 1 initial construction period (1958.9-1961.7) In order to meet the needs of the “Great Leap Forward” in 1958 to address Jiangsu Province Iron and steel-free situation, approved by the provincial and municipal governments, after seven months of design, while building, September 27, 1959, three three-ton vortex air side blow converter, put into production.