论文部分内容阅读
2015年11月16日,受中国三峡发展研究院的委托,中国水利水电建设工程咨询有限公司在北京主持召开了巴基斯坦科哈拉(Kohala)水电站可行性研究设计概算专题咨询会议。会议咨询认为,本工程可研设计概算达到了水电工程可行性研究阶段设计深度,基本符合现行水电工程设计概算编制和国家对外投资管理以及项目所在国有关规定的要求,投资编制成果整体水平基本合适。会议还对设计概算需要调整完善的内容提出了相关建议。自2010年以来,中水北方公司开展了大量
On November 16, 2015, commissioned by China Three Gorges Development Research Institute, China Water Conservancy and Hydropower Engineering Consulting Co., Ltd. hosted a special consultation meeting on the feasibility study design of Kohala Hydropower Station in Beijing. According to the conference consultation, the feasibility study budget of this project has reached the design depth of feasibility study stage for hydropower projects, which basically meets the current requirements for the preparation of design estimates for hydropower projects and for the administration of state investment abroad and for the countries where the project is located. The overall level of investment preparation results is basically suitable . The meeting also made recommendations on the content of the design budget needs to be adjusted. Since 2010, a large number of companies in the water north