论文部分内容阅读
1 概况柳钢3号高炉于1989年9月10日建成投产,2002年8月1日停炉大修,一代炉役达12年11个月,产铁291.23万吨,单位炉容产铁9517.31吨。该高炉采用大框架结构,高炉设计有效容积306m~3,设1个铁口,2个渣口,12个风口,双钟炉顶,斜桥料车上料,高炉煤气用湿法处理,配备4座内燃式热风炉,炉底、炉缸采用高铝砖和炭砖复合砌筑。1996年和2001年对炉体进行两次
1 Overview Liuzhou Iron and Steel No. 3 blast furnace was put into operation on September 10, 1989, August 1, 2002 shutdown overhaul, a generation of furnace service up to 12 years and 11 months, producing 2.9223 million tons of iron, unit capacity of 9517.31 tons of furnace capacity . The blast furnace adopts the big frame structure. The effective volume of the blast furnace is designed to be 306m ~ 3. There are 1 iron mouth, 2 slag mouths, 12 tuyeres, double bell roof, inclined bridge material car and blast furnace gas wet treatment. 4 internal combustion stove, bottom, hearth with high alumina brick and carbon brick composite masonry. The furnace was made twice in 1996 and in 2001