近年来,除了312国道,贯穿常州南北的京杭大运河对常州经济与社会发展的制约也逐步显露,因此常州人制定了一个伟大的决策:将运河和312同时改线。312国道常州改线段利用已经建成的常州南环线和正在实施的京杭大运河改线线位,从常州市区与武进区之间穿城而过,直至邹区,接镇江。全长40.3公里,扩建断面标准为25.5米(17.1公里)、40米(1.7公里)、43.5米(21.5公里);主要工程量为:拆迁房屋31万平方米,路基土石方250万方、软基处理97万延米、桥梁18座(其中互通1座)。工程概算总投资约14亿元。
In recent years, with the exception of State Road 312, the constraints on economic and social development of Changzhou are gradually revealed by the Grand Canal running north and south of Changzhou. As a result, Changzhou has made a great decision to reopen the Canal and 312 at the same time. 312 State Road Changzhou change line segment has been built by the Changzhou South Link and the implementation of the Beijing-Hangzhou Grand Canal to change lines, from Changzhou and Wujin District through the city, until the Zou District, then Zhenjiang. The total length of 40.3 kilometers, the expansion section of the standard 25.5 meters (17.1 kilometers), 40 meters (1.7 kilometers), 43.5 meters (21.5 kilometers); major projects are: demolition of houses 310,000 square meters, 2.5 million cubic meters of roadbed earth and stone, Processing 970,000 Yanmi, 18 bridges (of which 1 interoperability). The total estimated project investment is about 1.4 billion yuan.