山西铝厂是国家重点建设项目之一。一期工程于1983年7月开工,1987年12月建成投料,1989年4月通过国家验收。二期工程分两步建设,其中二期一步工程已于1992年12月试车成功;二步工程也将于1994年三季度建成投料,年底全部建成。届时山西铝厂将形成年120万吨氧化铝生产能力,成为我国最大的氧化铝生产基地。 一期工程采用烧结法工艺,主要引进美国和德国的氧化铝焙烧技术和流态闪速焙烧炉成套设备;二期工程采用混联法(烧结法~
Shanxi Aluminum Plant is one of the key national construction projects. A project started in July 1983, built in December 1987 feed, in April 1989 through the national acceptance. The second phase of construction in two steps, of which two one-step project has been successfully commissioned in December 1992; two-step project will also be completed in the third quarter of 1994 feeding the end of all completed. By then, Shanxi Aluminum Plant will form an annual output of 1.2 million tons of alumina production capacity and become China’s largest alumina production base. A project using sintering process, the main introduction of the United States and Germany alumina roasting technology and flow flash roaster complete sets of equipment; two projects using hybrid method (sintering method ~