一机部西安设计院动力组与河南平顶山高压开关厂一起,在该厂进行了高温热水(150°/90°)采暖系统中间工业性试验。试验系统于1974年11月投入运行,连续运行近二个月,基本达到了运行安全、可靠、简便的要求。
The power unit of Xi’an Design Institute of the First Engine Department together with the Henan Pingdingshan High Voltage Switchgear Factory conducted an intermediate industrial test of a high-temperature hot water (150°/90°) heating system. The test system was put into operation in November 1974. It has been operating for nearly two months continuously and basically met the requirements for safe, reliable and simple operation.