水利水电工程由于影响投资的因素较多,对其项目实施阶段的投资控制工作亦应加强。实施阶段投资控制的主要措施包括:签订限额设计;明确合同条款,减少业主风险;建立健全计量及支付制度;加强现场投资控制;加强工程变更控制;做好完工结算等。
Due to many factors affecting investment, water conservancy and hydropower projects should also be strengthened in investment control during the implementation phase of the project. The main measures of investment control in the implementation phase include: signing the quota design; defining the terms of the contract, reducing the risk of the owner; establishing and improving the measurement and payment system; strengthening the control of the on-site investment; strengthening the engineering change control;