葛洲坝大江电厂计算监控系统原由加拿大 CAE 公司引进,现由南端自控公司进行改造,从签订合同到全部投运完成仅用9个月的时间,实现了对全厂机组、辅设、开关站、公用系统等受控设备进行控制、调节全部功能,并投入实用。由此可见,监控系统除先进性、成熟性、可靠性外,更须实用性才能真正发挥计算机监控系统的作用。
Gezhouba Dajiang Power Plant calculation and monitoring system originally introduced by CAE Canada, is now controlled by the southern end of the company to transform, from the signing of the contract to complete the commissioning of the completion of only 9 months time to achieve the entire plant units, auxiliary facilities, switch stations, public Systems and other controlled equipment control, adjust all functions, and put into practical. Thus, in addition to advanced monitoring system, maturity, reliability, but also to be practical in order to truly play the role of computer monitoring system.