论文部分内容阅读
本文通过山东省淄博市引黄供水工程新城水库泵站前池模型试验的总结,说明合理的泵站前池体型及减少泵站前池泥沙淤积的工程措施.
This paper summarizes the model test of the front pool of Xincheng Reservoir Pumping Station of Zibo Yellow River Diversion Project in Shandong Province, which shows the reasonable shape of the front pool of the pump station and engineering measures to reduce the sedimentation in the front pond of the pump station.