论文部分内容阅读
在绥中电厂一期工程2×800MW机组施工中,成功地采用变换坡度下滑法进行3条腿塔吊整体下滑。此文介绍了该施工方法的要点和注意事项。
During the construction of the 2×800MW unit of the first phase of the Suizhong Power Plant, the three-legged crane was successfully used to reduce the overall decline of the three-leg tower crane. This article describes the main points and precautions of the construction method.