在机械压力机生产过程中,为考核产品性能质量,根据通用技术条件的规定,生产厂在机器安装调试之后通常都应进行负载试车等各种试验。过去负载试验都是用冲压试料的方法来实现的,测试方法也比较落后,在经济上也极不合算,不仅要制造昂贵的模具,而且还消耗大量的试料。如我厂生产的J31-315吨压力机,若做八个小时的连续冲裁试验,就要消耗试料102.7吨;JA31-630吨压力机如连续冲裁八小时就要消耗钢材212吨。这种方法一不经济,二不准确,
In the mechanical press production process, in order to assess the performance of product quality, according to the provisions of general technical conditions, the production plant after the installation of the machine should usually be carried out a variety of tests such as load test. In the past, the load tests were all made by the method of stamping the samples. The testing methods were relatively backward and economically very uneconomical. Not only expensive molds but also a large amount of samples were consumed. If I plant the J31-315 tons of presses, if eight hours of continuous blanking test, it will consume 102.7 tons of samples; JA31-630 tons of presses such as continuous blanking eight hours will consume 212 tons of steel. This method is not economical, two inaccurate,