水利水电工程工地自设木材加工厂的板枋材加工费,长期以来都是依据当地的规定执行,其主要弊端是加工费用高,重复计算加工费,有悖于概算编制原则,很有必要改进。为合理控制工程造价,很有必要制定板枋材加工定额。本文是以厂家提供的生产能力,结合现有带锯机的配置状况,探求“板枋材加工参考性的概算定额”也希望水利水电造价管理部门能尽快制定此种定额,以确保工程造价的质量。
Water conservancy and hydropower engineering site Own wood processing plant board 枋 material processing fees, has long been based on local regulations, the main drawback is the high processing costs, processing costs repeatedly calculated, contrary to the principle of budget preparation, it is necessary to improve . In order to control the project cost reasonably, it is necessary to make the plank material processing quota. This article is based on the production capacity provided by the manufacturer, combined with the configuration of the existing band saw machine to explore “plank material processing reference budget estimate ” also hope that the water conservancy and hydropower construction cost management department as soon as possible to develop such a quota to ensure the project Cost of quality.