论文部分内容阅读
鞍钢炼铁厂有十座大中型高炉,分三排组成高炉群,日产生铁2.15万吨.为强化生产调度指挥,加速信息传递,使炉况稳定顺行,以提高生铁产量、降低焦炭消耗,鞍钢炼铁厂与有关单位协作配合,于1988年10月开始研制高炉群生产动态集中监视计算机系统.该系统于1990年4月1日投入运行.它包括8个采集站,将全厂十座高炉主要仪表信号(热风压力、冷风压力、冷风流量、透气性指数、炉顶压力、盖间压力、料线、炉顶温度、铁水温度、煤粉喷吹量、喷油量、
Anshan Iron and Steel Co., Ltd. has 10 large and medium-sized blast furnaces, blast furnace group formed in three rows, producing 21,500 tons of iron daily production order to strengthen the command and speed up the transfer of information to make the furnace stable and orderly, in order to improve pig iron production and reduce coke consumption , Anshan Iron and Steel Works and the relevant units in collaboration with the cooperation in October 1988 began developing blast furnace production dynamic centralized monitoring computer system.The system was put into operation on April 1, 1990. It includes eight collection stations, the whole plant ten Block blast furnace main instrument signals (hot air pressure, cold air pressure, cold air flow, permeability index, top pressure, pressure between the lid, line, top temperature, hot metal temperature, pulverized coal injection,