论文部分内容阅读
在我国高速铁路已经进入了建设以及快速运营的时代,但是高速铁路对于线路的平直性要求非常高,所以在进行高速铁路建设的时候会在桥隧施工方案上花费比较大的时间以及经济成本,特别是部分地区在建设高速铁路的时候需要穿梭在山区之间,在山区之间进行铁路修建的几率比较大。近几年,随着我国大量的公路桥梁以及铁路的建设证明,在进行铁路设计、施工以及维护管理的过程中如果存在质量问题就会严重影响到隧道衬砌施工的质量,对列车的运行以及人们出行的安全带来一定的影响。
In our country, the high-speed railway has entered the era of construction and rapid operation. However, the requirements of the high-speed railway for the straightness of the line are very high. Therefore, when constructing the high-speed railway, it will take a relatively large amount of time and cost for the construction of the bridge and tunnel In particular, some areas need to shuttles between mountains in the construction of high-speed railways, and there is a greater chance of railway construction in the mountains. In recent years, with the construction of a large number of highways, bridges and railways in our country, it is proved that if there are quality problems in the process of railway design, construction and maintenance and management, the quality of tunnel lining construction will be seriously affected, and the train operation and people Travel safety has a certain impact.