生产力快速发展和社会不断进步的同时,也带动了电力工程中各项基础设施建设的繁荣。提高电力工程造价水平也越发的受到各方关注,所以在工程项目中如何控制电力工程造价,如何将造价控制在合理范围,是当前电力企业工作重点。我国电力工程造价控制措施随着市场经济的变化调整而不断发展进步,但是因为原材料价格的不断上涨与建设规模的扩大,加之我国电力工程造价本身存在的一些管理问题,使电力工程造价遇到了不小的挑战。本文从电力工程造价的设计、施工和竣工结算三个阶段分析,总结了控制工程造价的一些措施。
With the rapid development of productive forces and the continuous improvement of society, the prosperity of various infrastructure projects in power engineering has also been stimulated. Therefore, how to control the cost of power engineering in construction projects and how to control the cost in a reasonable range are the focuses of current power enterprises. China’s power project cost control measures with the changes in the market economy and continuous development and progress, but because of rising raw material prices and construction scale expansion, coupled with China’s power project cost itself, there are some management issues that make the power project cost is not met Small challenge. This article analyzes and summarizes some measures to control the construction cost from three stages of the design, construction and completion settlement of the power engineering cost.