论文部分内容阅读
最近对巴西东北部巴纳伊巴河流域的水电蕴藏量进行了评估。结果表明,可开发的水电蕴藏量约为817MW,单位成本估计为1700美元/kW,包括在巴纳伊巴河和巴尔萨斯河上修建8座水坝。
Recent hydropower reserves in the Baunaiba basin in northeastern Brazil have been assessed. The results show that the amount of hydropower reserves that can be exploited is about 817MW and the unit cost is estimated at $ 1,700 / kW, including the construction of eight dams on the banks of the Barnaiba and Balthasar.