论文部分内容阅读
上海汽轮机厂研制的高炉煤气膨胀透平发电装置于1986年8月在梅山通过鉴定。参加鉴定会的有冶金部、上海市经委、上海冶金局、上海机电工业管理局、上海市电气联合公司、上海电站设备成套研究所、上海交通大学、上海机械学院、宝山钢铁总厂、首都钢铁设计院、杭州汽轮机厂、北京重型电机厂、梅山冶金公司等二十五个单位的有关专家。高炉煤气膨胀透平发电装置(即TRT)是近代发展起来的钢铁企业的一项重大节能技术,它利用高炉煤气余压在透平中膨胀作功发电,它对于我园有条件的钢铁企业今后采用、
Shanghai Turbine Plant developed blast furnace gas expansion turbine power generation plant in August 1986 in Meishan passed the appraisal. Participate in the appraisal will be the Ministry of Metallurgical, Shanghai Economic Commission, Shanghai Metallurgical Bureau, Shanghai Mechanical and Electrical Industry Authority, Shanghai Electric Alliance, Shanghai Power Plant Equipment Institute, Shanghai Jiaotong University, Shanghai Mechanical Engineering Institute, Baoshan Iron and Steel Plant, Capital Iron and Steel Design Institute, Hangzhou Steam Turbine Factory, Beijing Heavy Machinery Factory, Meishan Metallurgical Company, twenty-five units of experts. Blast Furnace Gas Expansion Turbine Power Plant (TRT) is a major energy-saving technology developed by the iron and steel enterprises in modern times. It utilizes the residual pressure of blast furnace gas to expand and generate power for power generation in the turbine. It is very useful for the future steel plant in our park use,