加强农村公路建设资金管理的措施。1.针对虚假申报、重复申报、多报建设规模套取国家资金这种情况,应该加强建设项目全过程财务管理和监督。建设项目前期工作主要包括项目建议书的提出、可行性研究报告、初步设计及施工图设计阶段。作为国家计划的审批部门要进行实地勘察,召开相关部门的联合会议,讨论决定工程立项,确保资金能够按照计划拨付。在建设项目实施过程中,首先要进行公开招投标,选用具备相应资质的施工单位进行施工。业主、施工单位、监理要相互制约、相互监督,以保证资金按照计划、规模、进度拨付。
Measures to Strengthen Capital Management in Rural Road Construction. 1. In the case of false declarations, repeated declarations and overreporting of the size of state-building funds, state-wide financial management and supervision of construction projects should be strengthened. The preparatory work for construction projects mainly includes the proposal of project proposal, feasibility study report, preliminary design and construction drawing design stage. As a state planning approval department to carry out field surveys, held a joint meeting of relevant departments to discuss the project decision to ensure that funds can be allocated in accordance with the plan. In the construction project implementation process, we must first conduct an open bidding, selection of qualified construction units to carry out construction. Owners, construction units, supervision to mutual restraint, mutual supervision, in order to ensure the funds allocated in accordance with the plan, size, progress.