东方采矿科学研究所为西伯利亚矿山生产联合公司的地下矿山制订了采掘工程水泥消耗量的定额,目的是为在各种矿山地质条件下支护围岩的混凝土需要量提供依据。该生产联合公司的矿井多半采用浇注混凝土支护和钢筋混凝土支护。塔什塔戈尔矿务局的矿山使用这两种支护型式支护的永久巷道为100%;阿巴坎矿务局的矿山占80%;卡兹和舍列戈什矿务局
The Oriental Institute of Mining Science developed a quota for the amount of cement consumed in mining projects for the underground mines of the Siberian Mining Production Consortium in order to provide a basis for the concrete requirements supporting the surrounding rock under various mine geological conditions. Most of the coal mines used in this joint venture company are cast concrete support and reinforced concrete support. The permanent roadway supported by the Tashtagol Mining Department using these two types of support is 100%; the mine at Abakan Mines accounts for 80% of the total; the Kazi and Shelegoz Mines