论文部分内容阅读
针对尿素装置在超负荷生产时,解吸水解系统运行中存在问题,我们采取了相应的整改措施。
For the urea plant in overload production, there are problems in the operation of desorption and hydrolysis system, we have taken corresponding corrective measures.