本文讨论了位于土耳其东北部克鲁赫河上正在建设中的高250m德里内尔拱坝。该拱坝建基面开挖施工已于2005年完成,大坝混凝土已经开始浇筑,预计将于2010年完成大坝混凝土浇筑。建成后,该坝混凝土总方量为330万m3,将是土耳其最高的拱坝,也是世界上最高的拱坝之一。本文详细讨论了大坝的抗震设计。重现期为10000年的安全评估地震的峰值加速度为0.35g。在该地震作用下,坝体中上部将出现沿水平施工缝的裂缝,带有键槽的灌浆横缝也将张开。于是,大坝顶部由于开裂而形成的混凝土坝块可能向水库方向发生位移,本文研究了该混凝土坝块可能出现的最大位移和转动位移。
This article discusses the under-construction 250m Darinair dam on the Kruger River in northeastern Turkey. Construction of the arch dam foundation excavation was completed in 2005, the dam concrete has started pouring, dam concrete is expected to be completed in 2010. Upon completion, the concrete aggregate of the dam is 3.3 million m3, which will be the tallest arch dam in Turkey and one of the tallest arch dams in the world. This paper discusses the seismic design of dams in detail. The peak acceleration of a seismic safety assessment of 10,000 years is 0.35 g. Under the action of the earthquake, cracks will occur in the upper part of the dam along the horizontal construction joints, and the grouted transverse joints with keyways will also be opened. As a result, concrete blocks formed at the top of the dam due to cracking may displace towards the reservoir. In this paper, the maximum displacements and rotational displacements of the concrete dam may be studied.