论文部分内容阅读
1987年12月8日至12日,由水利水电规划设计院主持,有水电部潘家铮总工程师、水规院何璟总工程师以及有关方面专家20余人参加,在上海对我院编制的(RGDPP)集成式微机辅助弧形闸门设计程序进行了鉴定.水利水电规划设计院为程序编制者庄文中和袁满两同志颁发了016号水利水电勘测设计专用程序鉴定书,还以(88)水规算字第2号文转发了水利水电勘测设计八个专用程序的鉴定
December 8, 1987 to December 12, chaired by the Water Conservancy and Hydropower Planning and Design Institute, the Ministry of MEP Pan Jiazheng, chief engineer of Water Regulatory He Jing and more than 20 experts attended the preparation of our hospital in Shanghai (RGDPP) Integrated computer-aided arc gate design program was identified.Water Water Resources and Hydropower Planning and Design Institute for the programmer Zhuang Wenzhong and Yuan Man two comrades awarded the No. 016 water conservancy and hydropower survey and design of special procedures for identification, but also to (88) water The word No. 2 transmitted the identification of eight special procedures for water conservancy and hydropower survey and design