论文部分内容阅读
43号街坊工程深基坑开挖引起的盆式沉降,对相邻的诸圣堂造成了不利的影响。通过对诸圣堂的基础及时进行夹墙梁加固和锚杆静压桩补桩加固,减少了沉降,确保了诸圣堂的安全使用。
Basin settlement caused by the excavation of Deep Foundation Pit No. 43 has adversely affected the neighboring churches. Through the foundation of the All Saints in a timely manner to strengthen the folder wall beams and bolt static pressure pile reinforcement, reducing the settlement to ensure the safe use of All Saints.