论文部分内容阅读
最近从有关方面获悉:近5年来广东投入450亿元兴水利除水害,其数额为前5年的3倍,投入力度和水平创历史新高。5年的投入换来水利建设的巨大成就:在基本建设方面,首先建成2座大型水库,即北江流域控制性项目——飞来峡水利枢纽工程、漠阳江流域骨干工程——大河水库,其中“飞来峡”是广东目前最大的水利枢纽工程;其次建成9座中型水库、160座小型水库;同时建成中型水闸7宗、江河堤围13条(其中捍卫万亩以上的堤围3条)。在提高原有设施抗御能力方面,完成90多座大中型水库除险加固、50多座捍卫万亩以上堤围除险加固、70多座排涝站除险加固、2529座小型水库除险加固;每年平均加固维修的江堤约1600公里、海堤
Recently, it has been learned from relevant parties that in the recent five years, Guangdong has invested 45 billion yuan to eliminate water damage and water damage, amounting to three times the amount of the previous five years and devoted efforts and levels to a record high. Five years of investment in exchange for the huge achievements in water conservancy construction: In terms of capital construction, first of all, two large reservoirs, namely the controlled project of the Beijiang River Basin - Feilaixia Water Control Project, the backbone project of the Yangjiang River Basin - Dahe Reservoir “Flying to the Gorge” is currently Guangdong’s largest water control project; followed by the completion of 9 medium-sized reservoirs, 160 small reservoirs; at the same time the completion of 7 medium-sized sluices, river embankment Wai 13 (of which defend the mu of more than 3) . In improving the resilience of existing facilities, more than 90 large and medium-sized reservoirs were reinforced and more than 50 reservoirs were demolished for reinforcement and protection, more than 70 drainage stations were reinforced and 2529 small reservoirs were reinforced and reinforced each year The average reinforcement of the river bank about 1,600 km repair, seawall