针对鄂钢5号高炉2、3号热风炉燃烧室隔墙垮塌倾斜问题,采用浇注陶瓷钢纤维浇注料的方法,即在整个燃烧室隔墙上加装厚150mm的新工作层,对隔墙进行了整体加固修复。与传统逐层砌砖大修隔墙的方法相比,大大缩短了检修工期。修复后的生产效果表明,热风温度较修复前提高了150℃,高炉综合焦比由588 kg/t下降为556kg/t,达到了节能降耗的效果,取得了较好的效果。
Aiming at the problem of collapse of the partition wall of blast furnace combustion chamber No.2 and No.3 of No.5 blast furnace in Hubei Iron and Steel Group, a method of pouring ceramic fiber castings was adopted. That is, a new working layer with a thickness of 150mm was added to the whole combustion chamber partition, The overall reinforcement repair. Compared with the traditional method of repairing the wall by layer by brick, the maintenance period is greatly shortened. The repaired production results show that the hot air temperature is increased by 150 ℃ compared with that before the remediation, and the comprehensive coke ratio of the blast furnace is reduced from 588 kg / t to 556 kg / t, achieving the effect of saving energy and reducing consumption, and achieved good results.