我矿是一个采选联合的矿山企业,各类管道近120km,泄漏 点32万个(含各类室内管道)。伴随着企业的发展,我矿采取了一系列措施,狠抓管网密封治理工作,取得了一定的成效,全矿管网泄漏率控制在2‰以下,确保了全矿管网的正常运行。 1 加强领导,健全组织 我矿是一个建矿50多年的老矿区,伴随着矿区建设,地下报废管网已有两代,由于原始资料技术数据保存不全,导致地下废弃管道与运行管道互连,生活用水与生产用水暗连现象严
Mine is a mining and mining joint mining companies, all kinds of nearly 120km pipelines, leaks 320,000 (including all types of indoor pipelines). With the development of enterprises, I adopted a series of measures to mine, pay close attention to pipe network sealing work, and achieved some results, the whole mine pipe leakage rate control below 2 ‰, to ensure the normal operation of the whole mine pipe network. 1 Strengthen the leadership and improve the organization I Mine is a 50-year-old mining area construction, along with the construction of the mine, underground scrapped pipe network for two generations, due to inadequate technical data of the original data, leading to the underground pipe and pipeline waste operation interconnection, Domestic water and production of water with the dark phenomenon