盘龙城遗址本体保护工程于2013年9月正式开工。在市政府各部门大力支持下,现阶段遗址保护建设工程正在顺利进行,目前工作进展简述如下:一、遗址内杂草及违章建筑已基本清除。对遗址宫城、城垣、古城门豁口处进行了适当修整。二、清理了大量严重破坏城墙结构的鱼塘淤泥和城址内外多处水坑洼地,为保护遗址城墙奠定了坚实基础。三、遗址内杨家湾考古发掘有序进行。目前
Panlongcheng ruins ontology protection project in September 2013 officially started. In the municipal government departments with the strong support of the current ruins protection and construction projects are well underway, the progress of the current work is as follows: First, the site of weeds and illegal construction has been basically cleared. The site Miyagi, the city wall, the ancient city gate gap at the appropriate dressing. Second, clean up a large number of fish pond silt that seriously damaged the structure of the city wall and many water potholes inside and outside the city site, laying a solid foundation for protecting the site wall of the site. Third, the site of the archeological excavation Yangjiawan orderly. Currently