论文部分内容阅读
砌块填充与框架的拉结一般均采用拉结筋砌在灰缝里的方案 ,这种方案在施工中存在不少问题 ,特别是对壁厚比较薄的空心砌块问题更为严重。为了解决上述问题 ,方便施工同时又满足规范要求 ,本文介绍一种通过砌体侧壁粉刷的拉结带进行填充墙与框架的拉结方案 ,并通过试验研究分析其拉结性能 ,证实该拉结方案比原拉结方案更有效、可靠并能符合抗震规范的有关要求 ,是一种值得推广的拉结方案
Block filling and drawing of the frame are generally used in the gray line in the gap in the program, this program there are many problems in the construction, especially for the relatively thin wall thickness of the hollow block problem is more serious. In order to solve the above problems and to facilitate the construction at the same time meet the requirements of the specification, this article describes a through the brick wall masonry pull band filling wall and the framework of the program, and through experimental study of its pull performance, confirmed that pull The knot scheme is more effective, reliable and complies with the relevant requirements of the seismic code than the original knot knot program and is a worthwhile promotion of the knot knot program