论文部分内容阅读
1 概 述白石水库大坝为混凝土重力坝 ,最大坝高50 .3m,坝长 513m,混凝土工程量为 50 .3万 m3 .施工技术引用日本碾压混凝土筑坝技术 ,即 RCD工法施工 ,工程于 1995年 5月开工 ,将在 2 0 0 0年末竣工 .碾压混凝土与常规混凝土相比较施工技术先进 ,从安全生产管理的角度上看 ,?
1 Overview Baishi Reservoir Dam is a concrete gravity dam with a maximum dam height of 50.3m and a dam length of 513m and a concrete volume of 500,000m3. Construction Techniques Citation Japanese RCC dam construction technology, namely RCD construction method, The project started in May 1995 and will be completed by the end of 2000. Compared with conventional concrete, roller compacted concrete is advanced in construction technology. From the perspective of safety management,