0 前言 T·C·V取自全面质量管理、关键线路法和价值工程的英文第一个字母,简称一体化管理方法。它是目标管理方法的一种转换体,起源于大型或特大型水电工程、交通工程的建设管理。例三峡工程、京九铁路、青藏铁路建设。由于工程恶劣的自然环境和特有的严格约束条件,在管理上具有多目标性,例工期、质量、安全、成本、效益、文明施工等都有极其严格的单项要求, 但是它们最终整体目标无一例外地不折不扣地要求达到全优。 1 基本原理 T·C·V一体化方法并不是T·C·V三种现代化管理方法的机械组合体,二者之间是有本质区别的。首先一体化方法中的三者之间不是相互独立的, 而是相互渗透、相互依赖、相互牵连、相互制约的。例
0 INTRODUCTION T · C · V is taken from the first letter of the English version of Total Quality Management, Critical Approach and Value Engineering, or “Integrated Management Approach” for short. It is a transformation of the target management approach, originated in large or extra large hydropower projects, traffic engineering construction and management. Example Three Gorges Project, Beijing-Kowloon Railway, Qinghai-Tibet Railway Construction. Due to the poor natural environment and unique strict constraints, it has many goals in management, such as construction period, quality, safety, cost, benefit, civilized construction and so on, all have extremely strict individual requirements, but they ultimately have no overall goal Exceptionally required to achieve full excellence. 1 Fundamentals The T · C · V integration method is not a mechanical combination of three modern management methods of T · C · V. There is a fundamental difference between the two. First of all, the three methods in an integrated approach are not mutually independent, but rather permeate each other, interdependence, mutual implication and mutual restraint. example