鱼台县陈湾排灌站建于1955年,现有装机7台560瓩,控制灌溉面积1.5万亩,排水面积1.8万亩。过去规章不健全,管用无计划,喝着“大锅水”,致使工程管理每况愈下。党的十一届三中全会后,这个站开展了“排灌站工作如何适应新形势”的讨论,制定了有关改革的规定,一面抓承包管理,一面抓多种经营,取得很好的效果。管理承包,一是用水承包,建立了承包管水的领导小组,由受益乡村干部和站管人员组成,制定了管水措施,实行用水定额奖惩制度,在完善测水手段的前提下按每条干渠所灌面积,分摊时间及灌水方数收费,年终超过时间,方数的扣罚承包人奖金,多余的水方、由用户分摊。采用这一承包方法使每亩水费由4.2元降到3.95元。二是实行
Yantai Chenwan Irrigation and Drainage Station was built in 1955 with an existing installed capacity of 560 units of 7 sets and 15,000 mu of irrigated area with a drainage area of 18,000 mu. In the past, the regulations were not sound, and there was no plan to use them. They drank “cauldron water”, causing project management to deteriorate. After the Third Plenary Session of the Eleventh Central Committee of the Communist Party of China, this station carried out discussions on how the work of the irrigation and drainage stations should be adapted to the new situation and formulated the provisions on the reform. While focusing on contracting management and focusing on diversified operations, the station achieved good results. Management contracting, first, water contracting, the establishment of a leading group of contracted management of water by the beneficiary village cadres and station managers, developed a water management measures, the introduction of water quotas rewards and punishments, improve the means of measuring water at the per The area irrigated by the dry-channel, charging time and the number of charging parties, the year-end over the time, the number of deductions awarded to the contractor bonus, excess water, assessed by the user. Using this contracting method, the water fee per mu was reduced from 4.2 yuan to 3.95 yuan. The second is to implement