STK—W—2型微电脑调速仪与水轮机电手动调速器配套,广泛应用于500KW以下的水轮发电机组实现自动调速。本项目于85年7月开始研制,87年1月厦门市科委立项,87年9月福建省经委立项,87年12月通过技术鉴定。样机于86年12月首次在武平塔里水电站投入试运行(水轮机型号 HL110—W—50,单机容量200KW),87年5月在同安莲花水电站投入试运行(水轮机型号 CJ22—W—65/1×10.5单机容量200KW),87年8月在同安大溪水电站投入试运行(水轮机型号
STK-W-2 microcomputer speed governor and hydroelectric governor supporting, widely used in 500KW below the hydro-generator to achieve automatic speed control. The project started to develop in July, 85, Xiamen City Commission of Science and Technology in January 1987, Fujian Provincial Economic Commission in September 1987, 87 December, passed the technical appraisal. The prototype was put into trial operation in Wuping Tarui Hydropower Station for the first time in December 86 (turbine model HL110-W-50 with unit capacity of 200KW) and put into trial operation at Tong’an Lianhua Hydropower Station in May 1987 (turbine model CJ22-W-65/1 × 10.5 single capacity 200KW), put into trial operation in Tong’an Daxi Hydropower Station in August 1987 (turbine type