山西神头发电有限责任公司(原神头第一发电厂)位于山西省朔州市,是我国“六五”、“七五”计划期间重点建设项目,1971年9月开始筹建,1973年10月破土动工,1987年12月全部建成投产。工程分三期建设,一期工程安装两台国产50MW汽轮发电机组,分别于1977
Located in Shuozhou City, Shanxi Province, Shanxi Shentou Power Generation Co., Ltd. (formerly Shentou No. 1 Power Plant) is a key construction project during the “65” and “75” planning period of China. Construction began in September 1971 , Broke ground in October 1973, all completed and put into production in December 1987. Construction in three phases, a project to install two domestic 50MW turbine generator sets, respectively, in 1977