高温石球热风炉的设计与试验研究

来源 :南京工学院学报 | 被引量 : 0次 | 上传用户:kingknife2000
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文叙述了1771年我国自行设计和建造的第一座高温固定床蓄热式石球热风炉。这座热风炉的出风温度达1550~1600℃,风温降为1.5℃/分,它满足了磁流体发电试验机组的需要。试验结果:炉子来流速度为0.65标米/秒,排烟温度为250℃,传热系数为12~20大卡/米~2·度·周期,燃气经床层的最大压降约1000毫米水柱。实践证明:该炉的设计是正确的,设计计算方法及所取数据也是适当的。 This article describes the first high-temperature fixed-bed regenerative ball-stone furnace designed and built in our country in 1771. The temperature of the hot blast stove reached 1550 ~ 1600 ℃ and the air temperature dropped to 1.5 ℃ / min. It meets the needs of the hydro-magnetic power generation test unit. Test results: The furnace flow rate is 0.65 standard meters / second, the exhaust gas temperature is 250 ℃, the heat transfer coefficient is 12 ~ 20 kcal / m ~ 2 · cycle, the maximum pressure drop of the gas through the bed is about 1000 mm Water column. Practice has proved that: the furnace design is correct, design calculation method and the data obtained is appropriate.
其他文献
久保田4YZ-3(PR0106Y)型玉米收获机,在玉米收获季节,橙白色搭配的机身,在田间格外靓丽养眼。而高效率的作业效果,为用户创造出高收益,是用户看好这款机器最重要的原因。此款
为适应高功率车用柴油机对活塞提出的高要求,必须运用一切可能的材料和结构造型。本文介绍了各种活塞结构,并叙述了磨损、坑边裂纹和销座裂纹诸问题。根据实机运转和模拟试验
一、精心选一选(本大题共有10小题,每小题2分,共20分.认真思考,相信你一定能选出其中惟一正确的答案!)1.下列代数式:a3b,-4,-32abc,0,x-y,3x中,单项式有().(A)3个(B)4个(C)5
美国休斯敦大学终学教授、美国西北大学荣誉教授徐增全博士于91年9月11、12日来同济大学访问,为我校结构工程学院师生作了学术报告,扼要而系统地阐述了研究统一理论的重要意
前言随着钢铁工业的发展,焦煤供应日益紧张。据估计,世界煤蕴藏量中焦煤仅占17%左右。因此各国在降低焦耗,扩大能源方面进行了大量的工作。在我国铸铁生产中,焦炭化铁炉的熔
22.很多本来可以获救的人却死了。误:A lot of men died who could be saved.正:A lot of men died who could have been saved.析:对过去情况进行推测,要在情态动词后接完成式,
锅炉水动力试验主要是调整炉膛下辐射48片水冷壁进水量的分配,以适应炉膛热负荷的分布,使各片水冷壁在下辐射区出口工质干度基本一致,保障水冷壁的安全运行。先通过冷态调整
随着单机功率的增长,对自动调节系统在保证锅炉的可靠性与经济运行方面,提出了更加严格的要求。因此,在锅炉机组的自动化技术设计里提供有关动态特性的计算结果,以证实所设
随着时代的变化新的城市设计观正在探索中,作者根据美国城市出现的问题,指出了当代城市生活的目标及为实现此目标,在城市设计中应考虑的几条标准。 With the changes of the
一、机组型式及历史情况黄台电厂4号机为51-50-1型汽轮机是哈尔滨汽轮机厂制造的。额定容量5万瓩,转速为3000转/分,直接带动交流发电机。汽轮机和发电机转子用半挠性联轴器