大冶铁矿自开始潜孔钻机试验以来,一直存在着冲击器“空打”的问题,特别是采用××厂最近制造的 YQ—150A 潜孔钻机冲击器以后。当钻具处在如图1位置时,钻头落底,活塞靠到钻头上时,冲击器照说应当停止作业,因为孔B(φ16—3个)达时应通大气,孔道 F、G 的压力都很低。但是大冶铁矿的实际经验证明,在作业过程中,钻具一提起来,钻头虽然同样处在如图1这样的位置,而冲击器仍然要工作,也就是我们所说的空打。
Since the start of the DDA drilling trial, Daye Iron Mine has been facing the problem of “blow-by-blow” of the impactor, especially after the recent manufacture of the YQ-150A DTH drill impactor by ×× plant. When the drill is in the position as shown in Fig. 1, the drill bit falls to the bottom. When the piston bears on the drill bit, the impactor shines said that it should stop working because the hole B (φ16-3) The pressure is low. However, the actual experience of Daye Iron Mine has proved that during operation, the drill tool is mentioned. Although the drill bit is also located in such a position as shown in FIG. 1, the impactor still needs to work, which is what we call open hit.