论文部分内容阅读
锦苏工程与向上工程基本上共用同一套通信系统,这套通信系统还将为后续开建的溪洛渡—浙西特高压直流工程提供通信通道。这样的设计节约了上亿元的配套通信工程建设成本,这是大规划带来的综合效应。特高压配套通信工程为相关线路的安全稳定运行,包括电力调度、电网自动化等提供了重要的保障,是坚强智能电网的神经中枢,为电网赋予了智慧。
The Jin Su project and the upward project basically share the same communication system. The communication system will also provide communication channels for the subsequent construction of the Xiluodu-Zhexi UHVDC Project. This design saves billions of yuan on the cost of communications engineering construction project, which is brought about by the comprehensive effect of large-scale planning. UHV supporting communications project for the safe and stable operation of the relevant lines, including power dispatching, power grid automation provides an important guarantee, is the nerve center of a strong smart grid, to give the grid wisdom.