论文部分内容阅读
2015年1月8日晚,云南会泽县迎来了今年的第一场雪。一夜之间,整个山川披上了洁白的盛装,景色虽美,但是会泽供电公司在纸厂地震灾区负责灾后重建的迤车供电所副所长林森心里却紧绷着一根弦,春节将至,眼前的这场大雪会给刚经历过地震破坏,已显得弱不禁风的纸厂电网带来影响,这将直接影响到灾区群众春节期间的生产生活用电。1月9日早上,雪花依然飘飘洒洒地下个不停,林森对纸厂营业点的谢雪飞说:“大雪天最担心树枝被雪压断对电力线路造成影响,如果雪还在继续下,要组织人员分组对纸厂线进行巡检。”不出他的预料,正当员工们准备
On the evening of January 8, 2015, Huize County in Yunnan ushered in the first snow of this year. Overnight, the entire mountain covered with white dress, the scenery is beautiful, but the Huize power company in the paper mill earthquake disaster area responsible for post-disaster reconstruction of the car power supply Linsen heart but tight with a string, the Spring Festival The snowstorm in sight of this will have an impact on the mills’ power grid that has just experienced the earthquake damage and has become fragile. This will directly affect the power consumption of production and living during the Spring Festival for the masses in the disaster areas. On the morning of January 9, the snow still drifts and gobbles up and down. Linsen said to Xie Xuefei at the paper mill’s business point: “Snow is most worried about the pressure on the power lines caused by the snow falling on the branches. If the snow continues , To organize personnel group inspection of the mill line. ”Not his expectations, just as employees prepare