首钢水厂选矿厂生产发展很快,原矿处理量逐年增加,尾矿量随之相应增加,使原设计的各尾矿砂泵站输送能力格外紧张,尤其是8PSJ胶泵插程(30m)不足,严重影响尾矿向尾矿坝排放,由于缓建新的5号总砂泵站(主要解决8PSJ胶泵扬程不足),为解决当前生产急需,首钢矿山公司与水电部良乡电力建设研究所及密云工业水泵厂合作,协同研究了8时、50m扬程两相流泵。1987年6月起,先后在大石河和水厂选矿厂尾矿系统进行性能标定和工业生产试验,1988年10月在水厂尾矿4号总砂泵站全面推广,达到了预期效果。
Shougang plant concentrator rapid development, the ore handling capacity increased year by year, the tailings volume accordingly increased, so that the original design of tailings pumping station transmission capacity exceptionally tight, especially the 8PSJ pump plug (30m) less than, Seriously affecting the discharge of tailings to the tailings dam. Due to the easing of the new No.5 total sand pumping station (mainly to solve the problem of insufficient lift of 8PSJ rubber pump), Shougang Mining Company and the Ministry of Water and Electricity Liangxiang Electric Power Construction Research Institute and Miyun Industrial pump plant cooperation, collaborative research 8:00, 50m head two-phase flow pump. Since June 1987, the tailings system of Dashihe and WTPs has been successively tested for performance and industrial production. In October 1988, the total sand pump station of No.4 tailings in WTPs has been fully popularized and the expected results have been achieved.