合山电厂4号、5号炉系DG300/100-5型固态排渣炉,倒U型布置,燃用当地劣质烟煤,采用左旋四角直流燃烧器。该炉燃烧器于1979年改为无烟煤型集中送粉,过热器布置如图1所示。两炉投运后发生屏式过热器爆管11次,经采取割除部分受热面,提高工质重量流速等措施后,消除了超温现象,运行7000小时尚未发生爆管。一、过热器爆管情况两炉投运后,4号炉运行5000小时发生了爆管,5号炉运行1万小时也相继爆管,两炉共
Heshan Power Plant No. 4, No. 5 furnace DG300 / 100-5 type solid slag discharge furnace, inverted U-shaped layout, the burning of local poor quality bituminous coal, the use of L-shaped four corners of the DC burner. The furnace burner in 1979 changed to anthracite-type powder, superheater layout shown in Figure 1. After the operation of the two furnaces, the screen superheater tube burst occurred 11 times. After taking measures such as removing some of the heating surfaces and increasing the weight flow rate of the working fluid, over-temperature phenomenon was eliminated and no squib was operated for 7000 hours. First, superheater burst pipe situation After the two furnaces put into operation, No. 4 furnace 5000 hours of operation occurred burst pipe, No. 5 furnace operation 10,000 hours have also burst pipe, a total of two furnaces