在北京广安门内建造的华北电力调度通讯工程,采用楼上建塔方案,调度楼共十层,屋顶标高+38.7m,总建筑面积6432m~2,楼顶上将修建一座微波通讯塔。采用预应力钢索斜拉塔结构方案,塔尖标高+117.0m,在标高+100.0m,+94.0m,+88.0m 分别设置三个微波天线平台,规划安装十副抛物面天线(4φ4.2m 和6φ3.2m)。预应力钢索斜拉塔由塔座、塔身、塔头和塔尖 The North China Electric Power Dispatching and Communication Project built in Guang’anmen, Beijing, adopts a tower construction plan, a total of ten dispatching floors, a roof elevation of +38.7m, a total construction area of ​​6432m2, and a microwave communication tower on the top of the building. The structure of the prestressed steel cable-stayed tower is adopted. The elevation of the spire is +117.0m. Three microwave antenna platforms are set at the elevations +100.0m, +94.0m, and +88.0m, respectively, and ten parabolic antennas (4φ4.2m 6φ3.2m). Prestressed steel cable tower with tower, tower, tower head and spire
其他文献
一、迁移口语经验,探究字母发音在传统的拼音教学中,教师为了让学生掌握字母的读音,煞费苦心,除了一遍又一遍地领读,尤其强调发音的口型及舌头的位置,有的教师甚至让学生拿一
一是要有浓厚的兴趣当同学们对某种事物产生兴趣时,就会积极主动地去接触、观察和研究它,因为好奇心是每个同学探索和创新的最基本的因素。如学习《磁铁》一课,同学们通过实
深圳特区新型高科技产业的快速发展为学院专业发展提供了生存与发展的空间。深圳建设国际先锋城市的崭新定位,对深圳经济社会发展提出了现代化、国际化的要求。社会发展从传
Since 2003,China's labor market has been facing two coexisting crises:a rural laborsurplus and a severe shortage of migrant labor.Using data from the 2000 Chin
一、前言目前,国内对国产材料试验机的技术改造措施较多,现就我厂对常用的DLY—60型万能材料试验机技术改造措施作以介绍。我们在该试验机上采用了电测技术,经技术改造后不
在日常生活中,使用电池的各种器具日益增多。而当小小的电池耗尽电能“退伍”之后,如果不能妥善处理的话,会给周围环境带来很大污染。一节废电池就是一颗隐形“炸弹”。据测定:一
同学们,你们会读书吗?对于这个问题,大多数同学可能感到可笑。不认识的字、不明白的词查查字典和词典就可以了,怎么不会读书呢?其实,读书是有学问的,不同的读 Students, wi
糖链抗原 CA2 4 2 (carbohydrate antigen 2 4 2 ,CA2 4 2 )是一种唾液酸化的粘蛋白型糖类抗原 ,人体正常组织中含量很少 ,甚至没有。发生恶性肿瘤时 ,肿瘤组织和血清中其含
随着陶瓷工业的发展,三、四层包括包装、彩绘、选瓷等综合厂房日趋增多,如何较好地解决这类厂房的垂直运输也就越来越成为带有普遍意义的问题。直接采用电动葫芦作为升降工
难点突破:一、理解重点词句:1.“泥泞”、“荆棘”、“脚窝”等词语对低年级学生尤其是城镇学生来说理解有一定难度,因此要引导学生联系生活经验加以理解。2.“雷锋叔叔原来