论文部分内容阅读
一、工程概况该工程为郑州铁路局北京顺义名特水产品试验场,位于北京顺义地区,其主要水产品为商品鳖。一期工程规划按年产商品鳖5万只进行设计,包括塑料大棚温室十个,露天鳖池以及锅炉房和其它生产生活房屋。本次采暖设计范围除了生产生活房屋外,主要是塑料大棚温室的采暖通风设计,另有一座锅炉房(两台4t/h蒸汽锅炉)。本文主要就温室的暖通设计作一些介绍。二、采暖设计主要根据养殖工艺要求进行设计。1.工艺要求:鳖性喜温,对环境温度的变化极为敏感,在天然条件下适于鳖摄食和生长的水温范
First, the project profile The project is Zhengzhou Railway Bureau Beijing Shunyi famous special aquatic products testing ground, located in Beijing Shunyi region, the main aquatic products for the commodity turtle. The first phase of the project is designed according to an annual output of 50,000 soft-shelled turtle products, including ten plastic greenhouses, open-air turtle ponds, boiler rooms and other production and living houses. The heating design in addition to the production of living outside the housing, the main greenhouse plastic greenhouses heating and ventilation design, and another a boiler room (two 4t / h steam boiler). This article mainly introduces the greenhouse HVAC design. Second, the design of heating mainly according to the requirements of farming technology. 1. Process requirements: soft-shelled turtle temperature, very sensitive to changes in ambient temperature, natural conditions suitable for feeding and growing water temperature turtle