承担大冶铁矿西采(全长11公里)高压输电线路大修任务的我一井巷公司机电工程队广大革命职工,在毛主席革命路线指引下,高举“鞍钢宪法”的旗帜,大搞群众运动,成功地采用了Ⅱ型双杆整体组装起吊就位安装的方法,提前15天按质保量地完成了施工任务。高压水泥电杆为Ⅱ型杆,它是由两根水泥电杆和有关夹具、拉线等组成,每根水泥杆为两段焊接而成,一般全高15米(少数为18米),
Under the guidance of Chairman Mao’s revolutionary line, he held the banner of “Ansteel’s Constitution” and carried out the masses’ work of undertaking the task of overhauling the high-voltage transmission line of the west mining (11km in total length) of the Daye Iron Mine Sports, the successful use of a type II double-rod assembly lifting the whole installation in place, 15 days in advance to complete the construction quality assurance. High-voltage cement pole for the type II rod, which is composed of two cement poles and related fixtures, cables and other components, each rod is made of two welded, the general height of 15 meters (a few of 18 meters)