埋藏式调压井弹性温度计算问题

来源 :东北水利水电 | 被引量 : 0次 | 上传用户:wywtqywqy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
引言埋藏式调压井衬砌的温度应力计算,涉及到计算理论,周围介质的温度,衬砌材料的热学性质以及施工等因素,是个复杂的问题。实践表明:埋藏式调压井只要施工中不出现裂缝,充水运行后,基本上不再产生裂缝,这是因为埋藏条件受温度,湿度变化影响较小的缘故。但在寒冷地区,露顶式调压井受温度变化影响就较大,衬砌一旦出现裂缝,将导致渗漏受冻, INTRODUCTION Calculation of temperature stress in buried surge shaft linings involves a number of issues, such as computational theory, the temperature of the surrounding medium, the thermal properties of the lining material, and the construction. Practice shows that buried surge tanks will not crack any more as long as there is no cracks in the construction. After the water-filled operation, cracks will not be generated any more because the burial conditions are less affected by temperature and humidity changes. However, in the cold area, the exposed pressure surge well is greatly affected by the temperature change. Once the lining cracks, it will cause the leakage to be frozen,
其他文献
外伤后小儿肘关节损伤较常见的骨折是肱骨髁上骨折 ,此种骨折占肘部骨折的 65%以上。笔者以小儿低位肱骨髁上骨折为重点 ,对本病的诊断和治疗情况作以论述。1 临床资料本组
目的 :探讨抗心肌肌球蛋白抗体对小儿心脏病的诊断价值。方法 :运用酶联免疫吸附法检测了 3 0例病毒性心肌炎 (VMC)、 14例扩张型心肌病 (DCM)、 10例风湿性心脏病 (RHD)、 2
二滩水电站主体土建及导流工程国际招标文件编制工作自1987年第四季度正式开展以来,已取得了可喜的成果,现报导如下。一、施工规划 (一)施工分标二滩水电站位于高山峡谷之中
第二松花江上游流域国土规划电力规划部分评审鉴定会已于1985年8月24日在长春市松辽宾馆召开。吉林省二松上游(丰满夫坝以上)国土规划领导小组副组长、水电部松辽水利委员会
辽宁省北镇县地处医巫闾山脚下。全县有25个乡镇,耕地114万亩,总人口50万人。建国以来,全县人民大搞治山治水,打井修渠,改洼治涝,建库修堤。到1986年累计建成小水库9座;机电
经原水利电力部科学技术进步奖评审委员会评选,能源部、水利部决定对原水利电力部一九八八年度科学技术进步奖获奖项目(201项)给予奖励并通报表扬。南京水利水文自动化研究
通识课是大学语文从人文选修课转为通识必修课是大学语文课程面临的机遇。大学语文教学应注重通识教育,即语文能力的训练。明确课程定位以及解决其他教学活动中的问题,是大学
湖北省应城县合阜渡槽是一简支式U形薄壳渡槽。槽身共67节,节长12米,伸缩缝宽40毫米左右。缝间原用沥青止水,但沥青易裂,止水效果较差。应城县水利局利用聚丙烯编织袋、棉布
南水北调工程重要的前期工作——穿黄探洞胜利贯通,用现实证明了在黄河底岩溶地层开凿隧洞的可行性,南水北调工程迈出了艰难而又关键的一步,展示出了光明的前景南水北调(东