论文部分内容阅读
解放以来,特别是一九五八年以来,我省水利建設規模較大,投产受益的工程設施逐漸增多。但在水利建設方面,群众自力更生筹集經費和国家补助或由国家主办与群众自筹相結合等,都沒有一个切实可行的办法。这样,就使得有些地方本来群众能自力更生地解决的,也由国家安排了投資,分散了力量,影响了集中优势兵力打歼灭战;有些地方群众本来可以自己办的,而在沒有安排投資的情況下,就依賴等待,使水利建設不能更快、更好地发展。已建成的水利設施。如水庫、自流灌溉、机电排灌
Since the liberation, especially since 1958, the construction of water conservancy projects in our province has been on a large scale, and engineering facilities benefiting from the operation have been gradually increased. However, in terms of water conservancy construction, there is no practical way for the masses to raise their own funds for self-reliance and state subsidies or the combination of state sponsorship and self-support by the masses. In this way, some places could have been resolved by the masses themselves, and the state has also arranged for investment, dispersed its power and affected the superiority and superiority forces to fight the war of annihilation. Some places where the masses could have done their own thing, and without arranging investment , They will rely on waiting so that water conservancy can not develop faster and better. Completed water conservancy facilities. Such as reservoirs, gravity irrigation, electrical drainage