2016年是冷中子非弹性散射谱仪建设项目进展的重要一年,项目所包含的冷中子极化三轴谱仪及广谱谱仪进入部件安装阶段。连接两台谱仪及中子源的冷中子导管及其屏蔽系统安装完成。冷中子极化三轴谱仪完成了单色器、样品台及分析器等整体光路的组装工作。与德国公司一起合作完成了速度选择器的安装及验收工作。极化核心部件S-bender及其与普通导管的切换器的安装
2016 is an important year for the progress of construction of the cold neutron inelastic scattering spectrometer project. The cold neutron polarization triaxial spectrometer and the broad spectrum spectrometer included in the project have entered the component installation phase. The cold neutron conduit connecting the two spectrometers and the neutron source and its shielding system are installed. Cold neutron polarization triaxial spectrometer completed the monochromator, sample stage and the overall assembly of the light path of the assembly work. Cooperated with German companies to complete the installation and acceptance of speed selector. Polarization core assembly S-bender and its installation with a common catheter switch