论文部分内容阅读
包钢焦化厂焦油工程最近以优等质量交工。负责施工的包头冶金建设公司有关单位,对工程质量高度负责、一丝不苟,用革命精神和科学精神解决了许多技术难题,受到有关方面的好评。焦油工程包括管式炉、循环水泵房、油库和蒸馏等系统,生产连续性强,机械化自动化程度也比较高,因此对工程质量的要求非常严格。特别是一百多台设备中,平均每台有十几项修、配、改的任务,给施工带来了不少困难。水压机高压油路系统的压力规定为
The tar project of Baogang Coking Plant has recently been delivered with excellent quality. The responsible company responsible for the construction of Baotou Metallurgical Construction Co., Ltd. is highly responsible for the quality of the project and is meticulous in its meticulous work. It has solved many technical problems with revolutionary spirit and scientific spirit and has been well received by relevant parties. The tar project includes tube furnaces, circulating water pump houses, oil depots, and distillation systems. The continuous production is strong, and the degree of mechanization automation is also relatively high. Therefore, the requirements for the project quality are very strict. In particular, more than one hundred equipment, each with an average of more than a dozen repair, match, change the task, has brought a lot of difficulties to the construction. The pressure of the hydraulic press high pressure oil system is specified as