论文部分内容阅读
在打桩工程中,随着硫磺胶泥接桩新工艺的出现,改装旧式打桩机成了迫切的任务。我公司一队原B型塔式打桩机架,在安装、拆卸、运输方面都比较困难,装拆劳动强度大、高空作业多、消耗材料多、费工费时。针对这种情况,我公司一队王荣福同志等对B17~#桩架进行了改造,将B型塔式桩机改为整体式打桩机,即采用井字架将零部件拼装改成分段拼装。这样就加快了桩架装拆速度,减少了高空作业量,减轻了劳动强度,提高了工效,很受工人欢迎。改装后的B17~#型桩架结构紧凑、管理方便。经投产使用,性能良好,效果显著,是B型桩架今
In the piling project, with the advent of the new process of sulfur cement mortar pile, retrofitting the old pile driver has become an urgent task. Our company’s original B-type tower piling frame is difficult to install, dismantle and transport. It has high labor intensity for loading and unloading, high overhead work, many materials consumed, and time-consuming work. In response to this situation, our company’s team, Comrade Wang Rongfu, and other comrades on the B17~# pile frame were rebuilt to replace the B-type tower pile driver with a monolithic pile driver. . This speeds up the installation and removal of piles, reduces the amount of high-altitude operations, reduces labor intensity, improves ergonomics, and is very popular among workers. The modified B17~# pile frame is compact and easy to manage. After being put into production, it has good performance and remarkable effect. It is a B pile frame